Running Projects
See current projects here: REF Projects
QTR 4/2026

QTR 1/2027

General Information
HPQ construction site
More information: HPQ construction
Project is running in time, influences mainly cause effort in future projects at IBK (new machines Hexapod, 10MN universal testing machine).
NCCR Demonstrator
The NCCR demonstrator can be inaugurated in November.
Defect cherry picker
The Manitou cherry picker in Bauhalle is defect and we have to replace it. Therefore a Haulotte rental machine is available until we have a new solution.
Measurement equipment
Because we have many active projects (53) this semester the measurement equipment is running out.
Therefore do an early planning for sensors and measurement setups and try to have as many sensors as it makes sense.
Lack of space in Bauhalle
Also space in Bauhalle is limited because of many projects. Please check to dispose as much material early if it is no longer required and also free project space if no longer required.
SAFETY
In case of accidents

https://ethz.ch/staffnet/en/service/safety-security-health-environment/accident.html
New Equipment
- Hexapod (Chatzi): An evaluation report for possible new locations was received.
Location on old strong floor is preferred. Feasibility study is in progress.
This includes a test with the air cussions on the old strong floor in November. - 15MN machine (Taras)
Tendering finished. Two bids were submitted. Decision by end of October 2026.