Running Projects
New:
Situation strong floors
Quartal 4/2018
Quartal 1/2019
Information
- Housekeeping
Out of the annual personal talks of Bauhallenteam the disorder of material in the labs was a big topic. Therefore the Bauhallenteam will strictly watch for disorderd project areas and if required contact supervisors if there is no improvement. - REF Project Management
There will be a Wikiworki (workshop) to show the application of the sharepoint platforms.
This should also lead to a discussion about system improvements.
WIKI: https://ibk-baug.sp.ethz.ch/wiki/SitePages/Home.aspxThe WIKI-platform Projects: https://ibk-baug.sp.ethz.ch/ptemp/SitePages/Home.aspx
A test period of the sharepoint system will last till end of February 2019. - HIF (+) restoration
– IBK has two offices in the renovated HIF building (Floor D and Bauhallen office).
– If common meeting rooms are required BAUG takes requirements till 2019/02.
Preliminary construction work will begin in 2019/12 with the access roads. This can also influence the gates of Bauhalle.
Removal of HIK and excavation work will start in 2019/04.Restoration stages:
https://blogs.ethz.ch/BUAG-IBK-Bauhalle/2018/06/13/ibk-ref-sonderinformation-hif-sanierung/Stage 1: June 2019-June 2020, Extension of North-Eastern-part HIF building
Stage 2: June 2020-May 2021, Restoration of Eastern-part and Toolshop – Toolshop will have temporary space in Bauhalle
Stage 3: May 2021-October 2022, Restoration Bauhalle - Hexapod (Chatzi)
The Hexapod of group Chatzi should be located in the north-eastern corner of Bauhalle.
This requires the ok from VAW where a meeting will be organized by Prof. Frangi. - New test stands
The successor of Prof. Fontana is in selection process. There were feasibility studies for new test stands for possible applicants.
Procurement
- Optical strain measurement unit Lunainc (Chatzi)
- Hexapod (Chatzi)
- Small fire furnace (Frangi)