Monthly Archives: November 2019

IBK REF Information – November 6th 2019

New ProjectsNew & Running Projects
See current projects here:
REF Projects

Situation strong floors

Quartal 4/2019

Quartal 1/2020

Information

HIF (+) restoration
Part of the Bauhalle must be cleaned from June 2020. Before there will also start installation work on heavy weight shelfes.

IBK (group Chatzi) will start a project where the excavation will be monitored by fiber optical sensors.
More information here:
https://www.ethz.ch/de/campus/entwickeln/bauprojekte/hif-projekt.html

Concrete grinding machine (HIF B64)
A new machine will be available in Dec. 2019.

Semester Projects FS 2020
We kindly ask for the proposal of all upcoming experimental projects for the next semester.
Please use Sharepoint to do so.
More information on experimental research in Bauhalle can be found here:
Experimental Research: https://ibk-baug.sp.ethz.ch/wiki/lab/Pages/IBK-REF-Projects.aspx
Lab Safety: https://ibk-baug.sp.ethz.ch/wiki/lab/Pages/Experimental%20Safety.aspx
IBK Wiki System          https://ibk-baug.sp.ethz.ch/wiki/SitePages/Home.aspx

Könn modular furnace
Because of ongoing problems with the implementation of the control system, Könn will propose a solution with a different hardware.

Fire tester (Frangi)
The test facility is proposed as SEP request. For continuing procurement an answer of the Schulleitung is required.

Christmas cleanup
As every year there will be a christmas cleanup in the last December weeks. We also ask all project members to organize cleaning of their environment till mid of December already.

Werkstattkonzept
According to the decisions of the Schulleitung IBK will not have a toolshop in the future. Arguments were send to the Werkstattkonzept-projectmanagers to secure a research toolshop inside the institute.

Procurement

  • Hexapod (Chatzi)
  • Small fire furnace (Frangi)
  • 15MN machine (Taras)
  • Hexapod (Taras)
  • New concrete grinding machine (IBK, IfB)