New & Running Projects
See current projects here:
REF Projects

Situation strong floors

QTR 3/2022

QTR 4/2022

The situation on the strong floor for the autumn semester is very busy. Therefore the projects have to be cleanly planned and executed.

Information

Schedule all tasks in Bauhalle by Friday of the privious week in the available Bauhallen outlook calendar!

Welcome to BAUHALLENTEAM

Andreas Reusser joined Bauhallenteam – happy to support you from now on.

HIF (+) restoration

HIF+ Information Site

From Baukommissionssitzung:

  • User of labs are responsible for labeling the entrance doors
  • The Pavillons on HPQ are will be demolished from August on, in October HPQ construction will start
  • Phase 2 of HIF contruction will be finished in December and is available for use from 16.12.2022! This is also true for the IBK laboratories HIF C34 and C36.
  • The new HIF entrance (final version) will be opened by August 2nd.
    This is also the date where Phase 3.1 (Bauhalle) is finished and can be used again.
  • There is a new MS-Teams Chat opened for sharing dynamic information of the construciton site. Interested can contact Ela Burmeister or Dominik Werne.

The following list shows open tasks in Bauhalle connected with the HIF refurbishment:

  • MAST and LUSET must be protected for phase 3.2. There is no solution yet since the planned contractor has declined.
  • A closed room solution for a requested storage room for measurement equipment is rejected by the construction management. We are working on it.
  • With the increased Bauhallenteam there is not enough office space.
    An extension of the Bauhallenoffice is planned.
  • A desired cleaning space in the HIF courtyard was not realized. The construction management proposes a solution where we should take our casting material to the VAW courtyard for cleaning. This is not accepted by the Bauhallenteam.

Schedule refurbishment Bauhalle

Procurement

  • Hexapod (Chatzi) – delivered, final location unclear
  • FIRE Simulator (Frangi) , delivery Sepbember 2022 – in construction
  • Vibrophore (Taras) – location in Bauhalle proposed
  • 15MN machine (Taras)
  • Replacement of Walter&Bai testing machine – SEP contract will be entered by 1st of September