IBK REF Information – December 4th 2019

New ProjectsNew & Running Projects
See current projects here:
REF Projects

Situation strong floors

Quartal 4/2019

Quartal 1/2019

Information

HIF (+) restoration

– The floor payload is generally fixed at 10KN/m2 by means of shear reinforcement.
– Construction management informed that unauthorized persons are entering the construction site. The construction are can not be used for shortcutting of footpaths!
– First monitoring sensors of group Chatzi are installed.
– A task for optimized space allocation for the institutes inside Bauhalle was started under the lead of Prof. Frangi.

Semester Projects FS 2020
We kindly ask for the proposal of all upcoming experimental projects for the next semester.
Please use Sharepoint to do so.
More information on experimental research in Bauhalle can be found here:
Experimental Research: https://ibk-baug.sp.ethz.ch/wiki/lab/Pages/IBK-REF-Projects.aspx
Lab Safety: https://ibk-baug.sp.ethz.ch/wiki/lab/Pages/Experimental%20Safety.aspx
IBK Wiki System          https://ibk-baug.sp.ethz.ch/wiki/SitePages/Home.aspx

Fire tester (Frangi)
The test facility accepted by Schulleitung and a budget was spoken.
There was a first meeting with the department buildings, as well as the purchasing coordination. The Kick-Off meeting with concerning companies will be organized in January 2020.

Werkstattkonzept
There will be a meeting with Schulleitung, D-BAUG, VAW and IBK in January. The aim is to secure a research toolshop inside IBK and a VAW toolshop beside the central toolshop of Thomas Meierhans.

Procurement

  • Hexapod (Chatzi)
  • Small fire furnace (Frangi)
  • Hexapod (Taras)
  • New concrete grinding machine (IBK, IfB)
  • 15MN machine (Taras)
    Possible locations:
locations 15MN machine Taras