Monthly Archives: March 2023

IBK REF Information – March 1st 2023

Leave a reply

Running Projects
See current projects here:
REF Projects

QTR 1/2023

QTR 2/2023

Information

Schedule all tasks in Bauhalle by Friday of the previous week in the available Bauhallen outlook calendar! Otherwise support can not be guaranteed.

HIF (+) restoration

HIF+ Information Site

UPDATE

  • HIF phase 2: Laboratories and building area is almost finished – projects can be interrupted by construction workers.
  • Phase 3.2 will be handovered by March 3rd. Nevertheless there are ongoing construction works.
  • Phase 3.3 already started which means, that area 3.3 is closed till end of November 2023.

Current Situation

  • experimental research can be performed in Bauhalle (Area 3.1 & 3.2 including both strong floors) and in the side labs HIF C34 & C36. Use the middle corridore to enter Bauhalle. The “small Bauhalle” is still under conctruction until June 2023.

HPQ – construction site

Information can be found in the link below:

https://ethz.ch/de/campus/entwickeln/bauprojekte/hpq-projekt.html

Procurement

NEW equipment

  • In 2023 data aquisition systems must be renewed (budget 50k)
  • Replacement of Walter&Bai testing machine – SEP contract was confirmed !!
  • Hexapod (Chatzi) – delivered – final location in process
  • FIRE Simulator (Frangi) , FIRST FIRE TEST passed 28.02.2023
    congratulation and a big thank you to Martin
  • Vibrophore (Taras) – location in Bauhalle guaranteed inside IfU area
  • 15MN machine (Taras)
  • outdoor storage space – GMIS proposal entered
  • outdoor cleaning area beside gate 27 (for casting tasks, sedimentation tank) – GMIS proposal entered