IBK REF Information – June 9th 2023

Running Projects

See current projects here: REF Projects

QTR 2/2023

QTR 2/2023

Information

HIF (+) restoration

HIF+ Information Site

  • Current Situation:
    – In area 3.1 & 3.2 ininfluences of the construction site must be expected (construction traffic, noise, dirt).
    – There is a list of defects for HIF. Please inform Bauhallenteam if you detect some construction defects.
  • HIF couryard closed: Thursday to Saturday, 15 – 17.06.2023
    dismantle the emergency roof
  • HIF inner courtyard closed (by the centrifuge): 07. August 2023 – zum 18. August 2023
    top layer installation
  • Kleine Bauhalle (HIF C80) will be finished from July 17th till 1st of August

HPQ – construction site

HPQ construction works do influence the nothern part of HIF, especially deliveries from Gustave-Naville Weg. More information can be found in the link below:

HPQ construction

FIRE Simulator

Our new test facility in action:

Procurement

Pay attention to long delivery times especially for measuring material!

NEW equipment

  • HBK data acquisition devices
  • Replacement of Walter&Bai testing machine – machine is ordered!!
  • Hexapod (Chatzi) – delivered – final location and engineering of foundation in process
  • Vibrophore (Taras) – location in Bauhalle guaranteed inside IfU area
  • 15MN machine (Taras)
  • outdoor storage space – GMIS proposal entered
  • outdoor cleaning area beside gate 27 (for casting tasks, sedimentation tank) – GMIS proposal entered