Monthly Archives: October 2020

IBK REF Information – October 14th 2020

Situation strong floors

New & Running Projects
See current projects here:
REF Projects

QTR 4/2020

QTR 1/2021

Information

Coronavirus emergency mode

All personal tasks in Bauhalle and IBK labs must still be scheduled in the available Bauhallen outlook calendar!

In addition person present inside the labs have to sign the tracking list next to the toolshop each day!
According to the new regulation the mask obligation is also a must in side the D-BAUG labs.


HIF (+) restoration
Logistics are heavily influenced in the area of gate 27. Large deliveries/removals must be planned minimum one week in advance.

The floor opening in the southern area of the construction hall must be closed in Q4/2020 according to the construction program. For this purpose, work will begin on Monday 19 Oct. 2002. On floor B in the delivery area, only the section under the ceiling opening will be covered with spriuts. Deliveries are still possible. Everything should be over by the end of November 2020.

From Monday 23rd November till December 11th there will be construction works on the extension of the heavy weight shelf. This could influence the green bender teststand and the wood tensioning machines.

From December 12th till christmas holiday the Bauhallenteam will be very busy with emtying the labs C36 and C36. In these days there will only be a minimum support for experiments!

CLOSED AREA – The side labs C34 and C36 will be emptyed till end of the year. Those areas (red in the image above) can not be used till end of 2021.



Savings program building department
There are three IBK projects influenced by the savings program:
– furnace procurement (Frangi)
– Hexapod foundation (Chatzi)
– on site tasks for testmachines (Taras)

Procurement

  • Hexapod (Chatzi), decision made – MTS
  • Small fire furnace (Frangi) , decision made – E-TERM
  • Hexapod (Taras)
  • 15MN machine (Taras)
  • Replacement of Walter&Bai testing machine (IfB, IBK) – not decided yet