Running Projects
See current projects here: REF Projects
QTR 2/2023

QTR 2/2023

Information
- Deadline is 1st July 2031 to apply for experimental student projects for the autumn semester
https://ibk-baug.sp.ethz.ch/ptemp/SitePages/Home.aspx - Schedule all tasks in Bauhalle by Friday of the previous week in the available Bauhallen outlook calendar! Otherwise support can not be guaranteed.
HIF (+) restoration
- Current Situation:
– In area 3.1 & 3.2 ininfluences of the construction site must be expected (construction traffic, noise, dirt).
– There is a list of defects for HIF. Please inform Bauhallenteam if you detect some construction defects. - HIF couryard closed: Thursday to Saturday, 15 – 17.06.2023
dismantle the emergency roof - HIF inner courtyard closed (by the centrifuge): 07. August 2023 – zum 18. August 2023
top layer installation - Kleine Bauhalle (HIF C80) will be finished from July 17th till 1st of August
HPQ – construction site
HPQ construction works do influence the nothern part of HIF, especially deliveries from Gustave-Naville Weg. More information can be found in the link below:
FIRE Simulator
Our new test facility in action:
Procurement
Pay attention to long delivery times especially for measuring material!
NEW equipment
- HBK data acquisition devices
- Replacement of Walter&Bai testing machine – machine is ordered!!
- Hexapod (Chatzi) – delivered – final location and engineering of foundation in process
- Vibrophore (Taras) – location in Bauhalle guaranteed inside IfU area
- 15MN machine (Taras)
- outdoor storage space – GMIS proposal entered
- outdoor cleaning area beside gate 27 (for casting tasks, sedimentation tank) – GMIS proposal entered