Running Projects
See current projects here:
REF Projects
QTR 2/2023

QTR 3/2023

Information
Schedule all tasks in Bauhalle by Friday of the previous week in the available Bauhallen outlook calendar! Otherwise support can not be guaranteed.
HIF (+) restoration
UPDATE
- Area 3.3 is closed till end of November 2023.
Current Situation
- In area 3.1 & 3.2 ininfluences of the construction site must be expected (construction traffic, noise, dirt). Contact Bauhallenteam if there are ongoing problems.
HPQ – construction site
Information can be found in the link below:
Fire Simulator
The fire simulator teams uses
https://www.notion.so/de-de
for managing know-how and projects of the new facility.
Procurement
Pay attention to long delivery times especially for measuring material!
NEW equipment
- In 2023 data aquisition systems must be renewed (budget 50k)
- Replacement of Walter&Bai testing machine – SEP contract was confirmed !!
- Hexapod (Chatzi) – delivered – final location in process
- Vibrophore (Taras) – location in Bauhalle guaranteed inside IfU area
- 15MN machine (Taras)
- outdoor storage space – GMIS proposal entered
- outdoor cleaning area beside gate 27 (for casting tasks, sedimentation tank) – GMIS proposal entered