New & Running Projects
See current projects here:
REF Projects
Situation strong floors
QTR 3/2021

QTR 4/2021

Information
Safety Introduction
all persons working in labs of IBK have to attend the safety introduction course. Please inform concerning persons.
https://doodle.com/poll/5rxkhszctvr9t5ke?utm_source=poll&utm_medium=link
Coronavirus emergency mode
Experimental research is possible following the ETH master plan:
https://ethz.ch/services/en/news-and-events/coronavirus.html
All personal tasks in Bauhalle and IBK labs MUST BE scheduled by Friday of the privious week in the available Bauhallen outlook calendar!
Unplanned tasks will not be supported.
HIF (+) restoration
https://ethz.ch/de/campus/entwickeln/bauprojekte/hif-projekt.htmlhttps://www.bau-cam.ch/hif
There will still be construction works around bauhalle which can influence experiments:
- Noise (Health, Concentration, detection of experimental events..)
- Vibration (measurement accuracy, Stability)
- Dust (measurement accuracy, Health, equipment functionality)
Scheduled events:
July 2021 | HIF C51 | Fire safety walls will be installed to the eastern part of Bauhalle. |
July 2021 | entrance Bauhalle | The new entrance to Bauhalle will be behind LUSET. |
Announcement of student projects
Till 1st of July 10 Projects including students were proposed and accepted.
Not all groups did inform about “experienced lab users” (ELU) yet. Therefore ELUs of other groups can be asked to support projects.
HPQ – construction requirements
The planned HPQ building next to HIF sets vibration criteria on very low levels causing additional effort for other projects (Hexapod, Hochfrequenzpulsatore..).
To have a better understanding of the ground characteristics around the HPQ location group Chatzi with the PHYS department started a measurement campaign.
Procurement
- Hexapod (Chatzi), decision made – MTS, will be delivered in July 2021
Release with conditions was granted by Schulleitung for 2021. - Small fire furnace (Frangi) , decision made – E-TERM
Project is granted by Schulleitung. - 1D laser scanner vibrometer (Chatzi)
- Vibrophore (Taras)
- Hexapod (Taras) (second priority)
- 15MN machine (Taras) (first priority)
- Replacement of Walter&Bai testing machine (IfB, IBK) – OK from IBK – IfB still pending