New & Running Projects
See current projects here:
REF Projects
Situation strong floors
QTR 2/2021

QTR 3/2021

Information
Coronavirus emergency mode
Experimental research is possible following the ETH master plan:
https://ethz.ch/services/en/news-and-events/coronavirus.html
All personal tasks in Bauhalle and IBK labs MUST BE scheduled by Friday of the privious week in the available Bauhallen outlook calendar!
Unplanned tasks will not be supported.
HIF (+) restoration
https://ethz.ch/de/campus/entwickeln/bauprojekte/hif-projekt.htmlhttps://www.bau-cam.ch/hif
There will still be construction works around bauhalle which can influence experiments:
- Noise (Health, Concentration, detection of experimental events..)
- Vibration (measurement accuracy, Stability)
- Dust (measurement accuracy, Health, equipment functionality)
Also building service failures must still be expected (electricity, water, cooling…).
The new office of the Bauhallenteam will be moved into in the second/third week of June. From there on you will find us in HIF D80.4. Support of experiments is limited in that time.
Scheduled events:
7.-18. June 21 | HIF D80.4 | Bauhallenteam moves to new office |
July 2021 | entrance Bauhalle | there will be a new entrance to bauhalle – see image on top |
Announcement of student projects
Student projects (Bachelor project/thesis, Master project/thesis) must be proposed until July 1 for the Fall Semester and January 1 for the Spring Semester. Late registrations will not be accepted.
PROPOSE NEW PROJECT
Order & clienliness in Bauhalle
Cleaning up Bauhalle is shifted to June cause of ongoing experiments and the movout of the Bauhallen office. Please make sure to label your material – or better, label and clean it up.
Procurement
- Hexapod (Chatzi), decision made – MTS, will be delivered in July 2021
Release with conditions was granted by Schulleitung for 2021. - Small fire furnace (Frangi) , decision made – E-TERM
Project is granted by Schulleitung. - 1D laser scanner vibrometer (Chatzi)
- Vibrophore (Taras)
- Hexapod (Taras) (second priority)
- 15MN machine (Taras) (first priority)
- Replacement of Walter&Bai testing machine (IfB, IBK) – OK from IBK – IfB still pending