New & Running Projects
See current projects here:
REF Projects

Situation strong floors
QTR 1/2021

QTR 2/2021

Information
Project planning
Apply early for new projects and make sure to follow the project process:
IBK-REF Project page
All students working in IBK labs must have joined a safety introduction.
Please invite those who have not participated yet:
Coronavirus emergency mode
Experimental research is possible following the ETH master plan:
https://ethz.ch/services/en/news-and-events/coronavirus.html
All personal tasks in Bauhalle and IBK labs MUST BE scheduled in advance with the available Bauhallen outlook calendar!
HIF (+) restoration
https://ethz.ch/de/campus/entwickeln/bauprojekte/hif-projekt.html
https://www.bau-cam.ch/hif
IBK side labs are cleaned and the new storage stage is in use.
Because of the limited space early task planning and information to the Bauhallenteam is essential.
From March on the entrance to Bauhalle from HIL will be changed through the eastern floor.
In floor HIF B all eastern side labs of IfB will be closed from end of February 2021.
The 200kNL Zwick machine is moved to HIF B65, the 10kN Zwick will be dismounted till phase 3.
Also the big cutting machin in HIF B53 is out of usage till phase 3.
Procurement
- Hexapod (Chatzi), decision made – MTS, will be delivered in July 2021
Release with conditions was granted by Schulleitung for 2021. - Small fire furnace (Frangi) , decision made – E-TERM
Release with conditions was granted by Schulleitung for 2021. - Hexapod (Taras) (second priority)
- 15MN machine (Taras) (first priority)
- Replacement of Walter&Bai testing machine (IfB, IBK) – OK from IBK – IfB pending